Nkolonga Stage 1 Complete!

08 June 2022 / By Gareth

We are delighted to have completed the first stage of our Nkolonga Health Post renovation project! It’s a been a long haul but it’s made an incredible difference for the clinic team and for the 10,000+ patients that access basic health care here.

  • Replaced all damaged doors, a door frame and all door locks.
  • Repaired and replaced windows and glass and installed additional burglar steel bars for security.
  • Replaced the concrete floor in the ART room.
  • Repaired the leaks in the roof and replaced damaged roofing sheets.
  • Removed and replaced all the faulty electrics and installed external LED security lights.
  • Replaced the floor in the maternity ward with tiles for improved sanitation and hygiene.
  • Built new shelving units for patient records, a new cupboard for filing and repaired existing storage.
  • Installed new curtain rails and new curtains for privacy.
  • Repaired and repainted all the walls.

    Thank you to all who supported us with this project!

Please continue to donate towards this project: Stage 2 is backup lighting and furniture. Stage 3: safe running water!